FloorTech® Liffey Meats Case Study
Summary
A flooring solution that would perform to BRC Global Standards for hygiene and one that could be installed quickly and efficiently with minimum downtown which is paramount for a busy production plant was the requirement.FloorTech®s Trazcon® Décor Screed System 3 was the optimum solution specified for the Boning Hall possessing all of the above qualities as well as being proven to be 98% cleaner than alternatives, impervious and easy to maintain.Aware that a busy production plant such as Liffey Meats required minimum disruption and minimal downtown, FloorTech® works were carried out over a three stage installation process which included the removal of the old floor coatings and contaminates, preparing the surface (allowing for the installation of new drainage system) and finally the application of resin floor finishes.FloorTech®s Trazcon® Décor Screed System 3 was the optimum solution specified for the Boning Hall possessing all of the above qualities as well as being proven to be 98% cleaner than alternatives, impervious and easy to maintain.As well as choosing the right flooring surface, there was also the matter of ‘installation time’ to consider.Aware that a busy production plant such as Liffey Meats required minimum disruption and minimal downtown, FloorTech® works were carried out over a three stage installation process which included the removal of the old floor coatings and contaminates, preparing the surface (allowing for the installation of new drainage system) and finally the application of resin floor finishes.