Virginia House Rebuild, Part 12 » Mark Gearhart
Summary
After scraping off all the old tile which was laid on top of old sheet vinyl, everything was cleaned down to bare wood, one inch at a time. As I removed the old sink, the mirror above it cracked big time, leaving strips of glue in the wall. The only thing is grouting, re-installation of the toilet, framing of the big corner mirrors, baseboard, and hanging the towel racks. We cut and hauled down 20 super-heavy pressure treated boards, which was pretty hard work for 2 relaxed guys from North Carolina. I replaced the throttle and cleaned everything out, the lower unit screws seem to be frozen and I cannot remove them.
Classifications
industries
No industries detected
applications
ERP & Process Management
AskAI Classifications
Labels
No AI classifications detected